building site
Baron De Maerelaan, Zeebrugge
Extension of the existing warehouses of 2XL Zeebrugge with a fully automated high bay warehouse.
To make this possible, the Lisseweegs Vaartje was partially moved and encased.
To supply the high bay warehouse, a new railway track is constructed and 10 extra looding docks are created in the existing buildings.
STRUCTURAL ENGINEERING
Skald Engineering
Baron De Maerelaan, Zeebrugge
2XL
13.500 m²
site start: April 2015
site end: July 2016