Harnes (FR)

McCain

Information

back to projects

Fully automated high bay deep-freeze warehouse next to the production buildings:

  • 2 separated deepfreeze warehouses, cladrack system, foundation slab on piles
  • twostorey building in precast concrete structure: shipping area, picking area, offices and technical room
  • shuttle-railway between production buildings and warehouse

building site

Harnes (France)

client

Kloosterboer/McCain

architect

  • AEC

main contractor

  • A-Construct

floor surface

17.260 m²

building time

site start: November 2009
site end: April 2010

loading