building site
Fabriekstraat 141
Expansion project on the Milcobel site in Kallo.
The tower building contains 3 stages in the production of milk powder: evaporators, spray drying tower, and filling. Each of these steps is characterized by a vertical set up. This is reflected in the choice of 3 vertical compartments and a technical compartment. In addition there is a completely new 'first processing', an extension of the car park and a new rainwater basin.
A massive concrete structure was chosen for the tower, consisting of precast hollow walls and cast in situ floor slabs.
STRUCTURAL ENGINEERING
Skald Engineering
Fabriekstraat 141
Milcobel
12.000 m²
site start: January 2015
site end: July 2016