Expansion project on the Milcobel site in Kallo.

The tower building contains 3 stages in the production of milk powder: evaporators, spray drying tower, and filling. Each of these steps is characterized by a vertical set up. This is reflected in the choice of 3 vertical compartments and a technical compartment. In addition there is a completely new 'first processing', an extension of the car park and a new rainwater basin.

A massive concrete structure was chosen for the tower, consisting of precast hollow walls and cast in situ floor slabs.

STRUCTURAL ENGINEERING

Skald Engineering

company

skald

building site

Fabriekstraat 141

client

Milcobel

architect

DDRA architects

main contractor

Bolckmans, Alheembouw

floor surface

12.000 m²

building time

site start: January 2015

site end: July 2016