Demolition and reconstruction of an existing office building. The existing building no longer meets the standards for a contemporary office building (free height, special techniques, etc.). Therefore, a complete demolition was chosen, where only the existing retaining walls are preserved, and a reconstruction.

The new structure is largely composed of precast concrete elements (beams in reinforced precast concrete, prestressed hollow core slabs, …). In some specific places, metal beams are mounted, almost in the thickness of the plate, for easy passage of HVAC ducts, …

Because of the public parking under the Wetstraat, a non-standard solution had to be developed for the preservation of the existing retaining walls.

company

evolv

building site

Wetstraat 51, Brussel

client

Alides

architect

LD2 Architecture

main contractor

Algemene Bouw Maes

floor surface

17.600 m²

building time

site start: November 2018
site end: June 2021