Senior care facility (95 housing units) with short stay center, local service center and 30 service flats.

First a new building was constructed to expand the available surface area, then part of the existing centre was demolished and rebuilt with more respect for the adjacent historical monastery. Part of the existing structure within the monastery itself was also renewed.

company

evolv

building site

Wilsonstraat 28A, Sint-Katelijne-Waver

client

OCMW Sint-Katelijne-Waver

architect

CONIX RDBM Architects

main contractor

Antwerpse Bouwwerken

floor surface

9.610 m² (nieuwbouw 8.400 m², verbouwing 1.210 m²)

building time

phase 1:
site start: May 2017
site end: February 2019
phase 2:
site start: October 2020
site end: March 2022